Independent lean and operational excellence consultants

Lean Laboratory - Give your lab the edge

Levelling the Load – Levelling Queue (leadtime available)

Here Tom talks about the concept of a levelling queue where you have lead time.

We use flow or velocity to reduce through-put times once you start. We use the difference between through-put time and the ‘real’ constraint lead-time to allow queuing time for levelling – samples won’t age as much as you think! And lab resources / capacity is matched to the levelled demand.

To view this video you must have the free Adobe Flash Player installed.

Click here to download the Flash Player.

  • Facebook
  • LinkedIn
  • YouTube
  • Twitter
  • RSS

Clients

It looks like you don't have flash player 6 installed. Click here to go to Macromedia download page.

Testimonials

Syngenta Seeds Inc.

"We were very impressed by BSM's analytical approach and rigor through-out the project. Their innovative 'take' on Lean in Labs helped them to identify superior opportunities and solution concepts and they guided us excellently through the detailed design and implementation parts of the projects."

Jason Abbas, Project Lead and Manager of Genotyping Platform Technologies